Letters were sent out with students Friday to address mold detected at A-C Central High School.
An error in the bid process apparently led to the purchase of materials that did not meet specifications for the roof.
As a result, 4 inches of rain that fell Thursday in Ashland flooded the junior high hallway, which made a soggy, smelly mess when it mixed with scrap construction material being used for the installation of a new air conditioning system.
Comments